CBE Electrical

EV Charging

Charge points fitted with the supply that suits them.

A charging point draws hard for hours every evening. Whether the existing installation supports it is decided at the site, not on a configurator.

The charger model you choose can wait - the supply decision cannot.

The Decisions That Matter

The charger is the least of the install - the supply decides the day.

Supply, board, cable route, earthing and parking geometry decide the installation long before the brand of charger. We look at those things at the address, tell you plainly what the options are, and then fit the unit, test it and hand it over with the paperwork the scheme requires.

Completed charging point with dedicated protection fitted at a home

Different Addresses

Every driveway argues its own case.

Homes in terraced streets, houses with detached garages and small workplaces each take a different shape: separate protection, cable runs buried at the right depth and the load management planned around evening cooking times. The assessment is visible in our photos of the finished board.

Fit the supply before the car arrives.

Send the house type and where the car sleeps. The reply names what needs a look and when a visit could happen.